NACE Certified NACE-CIP2-001 Dumps Questions Valid NACE-CIP2-001 Materials [Q34-Q55]

Rate this post

NACE Certified NACE-CIP2-001  Dumps Questions Valid NACE-CIP2-001 Materials

Current NACE-CIP2-001 Exam Dumps [2022] Complete NACE Exam Smoothly

NEW QUESTION 34
Centrifugal blast cleaning requires:

 
 
 
 

NEW QUESTION 35
When NACE/SSPC WJ 1 is referenced; what type of equipment would the Inspector expect to see on the job:

 
 
 
 

NEW QUESTION 36
A failure caused by applying a coating too thinly is known as

 
 
 
 

NEW QUESTION 37
You are the NACE Level 2 Inspector on a project where overcoating of galvanized steel is being performed. The specification references SSPC SP 16 as the surface preparation method. At the pre-job meeting operations personnel make it clear that abrasive blasting will not permitted. The Owner’s representative asks you what other methods might be used.
Of the options shown below, what would be the preferred option in this situation?

 
 
 
 

NEW QUESTION 38
Because a NACE Level 2 Inspector has been trained in specific destructive tests, it is up to the Inspector to decide if and when a destructive test is required.

 
 

NEW QUESTION 39
When environmental enclosures are being used an inspector needs to be concerned about:

 
 
 
 

NEW QUESTION 40
You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.
As this is not part of the standard you should:

 
 
 
 

NEW QUESTION 41
Pre-cleaning of work pieces will NOT remove

 
 
 
 

NEW QUESTION 42
WJ-1 is always performed using UHWJ at pressures above 210 MPa (30,000 PSI)

 
 

NEW QUESTION 43
Application of Thermal Spray Coatings requires:

 
 
 
 

NEW QUESTION 44
When conducting inspections the Inspector should follow which standards:

 
 
 
 

NEW QUESTION 45
The cost of qualified Coating Inspection is normally offset by:

 
 
 
 

NEW QUESTION 46
When observing design defects the NACE Inspector should:

 
 
 
 

NEW QUESTION 47
In the event of a conflict between the Product Data Sheet and the Specification:

 
 
 
 

NEW QUESTION 48
Surface preparation of concrete is performed using:

 
 
 
 

NEW QUESTION 49
Coating application to concrete substrates is:

 
 
 
 

NEW QUESTION 50
On pipelines, which coating is identifiable by its distinct colors, usually light blue, green, or grey?

 
 
 
 

NEW QUESTION 51
You are NACE Level 2 Inspector working on a tank lining job where a mobile centrifugal blast unit is being used to blast the tank floor to a NACE No.1/SSPC SP 5. The Contractor has completed his final blast and has called for a hold point inspection. This is the 1 st time you have seen field based centrifugal blast cleaning. You observe what appears to be staining on the substrate however the Contractor assures you this is normal when using centrifugal blast units and what you are seeing is what is defined in the standard as an acceptable variation in appearance.
Your FIRST preferred course of action is to:

 
 
 
 

NEW QUESTION 52
It is always possible to see moisture on a steel substrate:

 
 

NEW QUESTION 53
Which concrete smoothing technique involves scrubbing a mixture of cement mortar over the concrete surface using ai cement sack, gunny sack, or sponge rubber float?

 
 
 
 

NEW QUESTION 54
Coating surveys may include which steps?
Select All That Apply:

 
 
 
 

NEW QUESTION 55
NACE No.13/ SSPC 6 identifies the use of:

 
 
 
 

NACE-CIP2-001 Premium PDF & Test Engine Files with 100 Questions & Answers: https://www.passtestking.com/NACE/NACE-CIP2-001-practice-exam-dumps.html

admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

Post comment