Oracle 1Z0-1075-21 Exam Syllabus Topics:

Topic Details
Topic 1
  • Explain Common Inventory Configurations
  • Describe Import Production Transactions
  • Describe Manufacturing Lead-time
Topic 2
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Production Transaction Review and Product Genealogy
Topic 3
  • Reporting and Analytics for Manufacturing
  • Describe Manufacturing Cloud integrations
Topic 4
  • Set up and implement Cost Planning estimates
  • Describe and Compute Production Costs
  • Explain Work Execution Work Areas
Topic 5
  • Describe Manufacturing Supervisor Mobile Applications
  • Transfer Production Transactions to Costing
Topic 6
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Configure Resources, Operations, and Work Centers
Topic 7
  • Manage Production Calendars and add Shift and Work Center Resource exceptions
  • Describe how work definition is automatically generated
Topic 8
  • Execute Basic Transaction and Work Order Reporting
  • Explain Common Projects Enabled SCM Configurations
Topic 9
  • Describe Production Execution transactions (including Outside Processing)
  • Describe Functional Set Up Manager and Simplified Setup

 

Q32. The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

 
 
 
 

Q33. A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work DefinitionWD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2.
Identify the reason.

 
 
 
 

Q34. Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

 
 
 
 

Q35. In your customer’s manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies formthe Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?

 
 
 
 

Q36. While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
1. Template: Finished Goods (WIP = No, Customer Ordered =Yes)
2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
Identify the Item Attribute values in the application.

 
 
 
 

Q37. A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

 
 
 
 

Q38. A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.

 
 
 
 

Q39. The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

 
 
 
 
 

Q40. Your customer is a light assembly manufacturing company that doesn’t require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?

 
 
 
 
 

Q41. TheManufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day andNight Shift.
Identify the correct sequence of steps to achieve this requirement.

 
 
 
 

Q42. Identify three requirements fulfilled by nonstandard work orders.

 
 
 
 

Q43. Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

 
 
 
 

Q44. Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

 
 
 
 
 

Q45. A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.

 
 
 
 
 

Q46. Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the MorningShift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?

 
 
 
 
 
 

Q47. A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

 
 
 
 

Q48. Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?

 
 
 
 

Q49. Identify thetwo capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.

 
 
 
 

Q50. You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.

 
 
 
 

Q51. Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.

 
 
 
 

Q52. In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.

 
 
 
 

Q53. As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

 
 
 
 

Q54. One of the key execution capabilities that Oracle Manufacturing Cloud offers is thatyou can generate and manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?

 
 
 
 
 

Penetration testers simulate 1Z0-1075-21 exam: https://www.passtestking.com/Oracle/1Z0-1075-21-practice-exam-dumps.html

admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

Post comment