[Mar-2024] The Best Meter Data Management Study Guide for the 1z0-1091-22 Exam [Q13-Q28]

Rate this post

[Mar-2024] The Best Meter Data Management Study Guide for the 1z0-1091-22 Exam

1z0-1091-22 certification guide Q&A from Training Expert PassTestking

Q13. A time-of-use (TOU) template’s interval size controls the values allowed as start and end times. A template can be used to generate TOU data for TOU maps whose seconds per interval (SPI) is divisible by the template’s SPI.
For what can you use a 60-minute template?

 
 
 
 
 

Q14. Which step should you perform to configure commands in a SaaS environment?

 
 
 
 
 

Q15. You want to create Smart Grid Gateway (SGG) Payload Processing extendable lookup values. Which Groovy Library Method would you configure in the User Exit Interceptors section?

 
 
 
 

Q16. Which THREE Validation, Estimation, and Editing (VEE) rules are provided by the base Meter Data Management (MDM) product that you can include in a VEE group?

 
 
 
 
 

Q17. Your client wants to generate bill determinants for the billing system by using a time-of-use (TOU) group for
“on peak”, “off peak”, and “shoulder.” They also want to have holiday consumption categorized as “off peak” regardless of the day on which it falls.
What is the correct configuration for this?

 
 
 
 
 

Q18. 3. For a Meter Data Management (MDM) implementation, customer information system (CIS) requires the following bill determinants:
* For scalar meters, scalar consumption values will be sent to CIS.
* For interval meters, billed on time-of-use (TOU) rates, consumption values will be provided based on the specific TOU periods, for example: on-peak, off-peak, and shoulder.
Based on these requirements, which TWO usage subscription or usage calculation group configuration options should you set up to allow an implementation to send bill determinants to CIS?

 
 
 
 

Q19. What are the THREE uses of the Smart Grid Gateway (SGG)?

 
 
 
 
 

Q20. Which THREE features should you set up in the Cloud Service Payload Processing configuration?

 
 
 
 

Q21. Time-of-use (TOU) maps can be used by various functions in Meter Data Management (MDM). Which of the following is a typical scenario in which TOU maps are applied?

 
 
 
 

Q22. Which TWO functions can the service point-measurement cycle relationship of Meter Data Management (MDM) perform?

 
 
 
 

Q23. You need to set up a configuration that allows service points to be used with various meters. This configuration should support interval, time of use, and scalar devices.
How would you meet this requirement?

 
 
 
 

Q24. Your client requests you to design and set up data necessary to support an electric meter that is installed at a customer’s service point with solar panels:
* Channel 1: Measures the kWh that was consumed from the grid. This is an interval channel that measures in
60-minute intervals.
* Channel 2: Measures the kWh that was generated. This is an interval channel that measures in 60-minute intervals.
Using the Math usage rule, you must create usage transactions that take the difference between the consumed and generated channels, store and name the difference value, and store the derived curve.
Which THREE statements are true?

 
 
 
 
 

Q25. The client has installed scalar devices to measure the solar energy generated (export) and the energy received (import) from the market. This data is stored in separate measuring components (registers). The validation rules are generally the same for both measuring components, but there is one exception: the negative consumption check applies only to energy received (import).
Which TWO configurations ensure that the negative consumption rule is checked for energy received (import) only?

 
 
 
 
 

Q26. Assets and components can have specifications associated with them to describe design details and asset attributes.
Which THREE are correct Smart Meter specifications?

 
 
 
 
 

Q27. Which TWO Validation, Estimation, and Editing (VEE) rules are typically configured on a project for consumption synchronization processes?

 
 
 
 

Q28. From where is the final measurement condition code created?

 
 
 
 

The Best Oracle 1z0-1091-22 Study Guides and Dumps of 2024: https://www.passtestking.com/Oracle/1z0-1091-22-practice-exam-dumps.html

admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

Post comment