Oracle 1Z0-1075-21 Exam Syllabus Topics:

Topic Details
Topic 1
  • Set up and implement Cost Planning estimates
  • Describe and Compute Production Costs
  • Explain Work Execution Work Areas
Topic 2
  • Create and update Work Orders for standard and non-standard Work Orders and Serialized Manufacturing
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 3
  • Describe Production Execution transactions (including Outside Processing)
  • Describe Functional Set Up Manager and Simplified Setup
Topic 4
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Production Transaction Review and Product Genealogy
Topic 5
  • Manage Production Calendars and add Shift and Work Center Resource exceptions
  • Describe how work definition is automatically generated
Topic 6
  • Execute Basic Transaction and Work Order Reporting
  • Explain Common Projects Enabled SCM Configurations
Topic 7
  • Describe Manufacturing Supervisor Mobile Applications
  • Transfer Production Transactions to Costing
Topic 8
  • Reporting and Analytics for Manufacturing
  • Describe Manufacturing Cloud integrations
Topic 9
  • Create manufacturing Production Exceptions, including raising exceptions and managing and resolving exceptions
  • (New) Set up common Configuration Elements

 

NO.17 A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

 
 
 
 

NO.18 Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.

 
 
 
 

NO.19 The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

 
 
 
 
 

NO.20 A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

 
 
 
 
 
 

NO.21 Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the MorningShift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?

 
 
 
 
 
 

NO.22 In a manufacturingcloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

 
 
 
 
 

NO.23 An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

 
 
 
 
 

NO.24 The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

 
 
 
 
 

NO.25 A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

 
 
 
 

NO.26 To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.

 
 
 
 

NO.27 You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used to accomplish this task?

 
 
 
 
 

NO.28 Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the ManufacturingCloud?

 
 
 
 

NO.29 A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Whichscheduled process should you run to achieve this requirement?

 
 
 
 

NO.30 While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
1. Template: Finished Goods (WIP = No, Customer Ordered =Yes)
2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
Identify the Item Attribute values in the application.

 
 
 
 

NO.31 You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception andwho gets notified after an exception is raised?

 
 
 
 

NO.32 A Production Operator needs to load Work Order Transactions from an external system into Manufacturing Cloud.
Identify the correct sequence of tasks to be performed.

 
 
 
 

NO.33 Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

 
 
 
 
 

NO.34 You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.

 
 
 
 

NO.35 Your customer hasthe following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goodsas one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.

 
 
 
 

NO.36 You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

 
 
 
 

NO.37 A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.

 
 
 
 
 

NO.38 Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

 
 
 
 
 

NO.39 Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?

 
 
 
 

NO.40 In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transferthe assembly to cost accounting in frozen type.

 
 
 
 
 
 

NO.41 Identify three types of Item Quantities displayed in the Work Order History tab.

 
 
 
 
 

New Real 1Z0-1075-21 Exam Dumps Questions: https://www.passtestking.com/Oracle/1Z0-1075-21-practice-exam-dumps.html