Oracle 1Z0-1075-21 考试大纲主题:

主题 详细信息
主题 1
  • 解释常见的库存配置
  • Describe Import Production Transactions
  • Describe Manufacturing Lead-time
主题 2
  • 评估工单完成成本,包括部分成本和报废成本
  • 解释生产交易审查和产品谱系
主题 3
  • 制造业报告与分析
  • 描述制造云集成
主题 4
  • 制定并实施成本规划估算
  • 描述和计算生产成本
  • 解释工作执行工作区
议题 5
  • 描述制造主管移动应用
  • 将生产交易转入成本计算
主题 6
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Configure Resources, Operations, and Work Centers
主题 7
  • 管理生产日历,添加轮班和工作中心资源例外情况
  • 说明如何自动生成工作定义
主题 8
  • 执行基本交易和工单报告
  • 解释启用 SCM 配置的常见项目
主题 9
  • 描述生产执行交易(包括外部处理)
  • 描述功能设置管理器和简化设置

 

Q32. The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

 
 
 
 

Q33. A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work DefinitionWD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2.
找出原因。

 
 
 
 

Q34. Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

 
 
 
 

Q35. In your customer’s manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies formthe Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?

 
 
 
 

Q36. 在产品信息管理(PIM)中创建项目时,会依次选择并应用以下两个项目模板。
1.模板:成品(WIP = 无,客户订购 = 有)
2.模板:子装配(WIP = 是,客户订购 = 否)
确定应用程序中的项目属性值。

 
 
 
 

Q37. A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

 
 
 
 

Q38. A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.

 
 
 
 

Q39. 生产用户希望报告工单完成情况。
确定在工单操作层面报告工单进度的两种方法。

 
 
 
 
 

Q40. Your customer is a light assembly manufacturing company that doesn’t require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?

 
 
 
 
 

Q41. TheManufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day andNight Shift.
Identify the correct sequence of steps to achieve this requirement.

 
 
 
 

Q42. Identify three requirements fulfilled by nonstandard work orders.

 
 
 
 

Q43. Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

 
 
 
 

Q44. 确定供应链协调 (SCO) 可以创建工单的三个来源。

 
 
 
 
 

Q45. 生产主管从管理工单页面查询工单 (WO-1025)。在输入编辑工单:在 WO-1025 页面,他找到了 "一般信息"、"操作 "和 "历史记录 "选项卡,但没有找到 "预订 "选项卡。
找出可能导致不显示 "预订 "选项卡的两个原因。

 
 
 
 
 

Q46. 您的客户每天在她的工厂里运行两个班次:早班和晚班。工作中心 W1 分配了一个 LATHE 资源。有五个 LATHE 可用,其中三个可用于早班,其余可用于晚班。
要将 LATHE 与 W1 关联,必须执行哪两个操作?

 
 
 
 
 
 

Q47. A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

 
 
 
 

Q48. 客户希望大规模创建和修改工作定义以及电子表格中的相关操作、项目和资源。
使用 ADFDI(Oracle 应用开发框架桌面集成)不支持哪两种操作?

 
 
 
 

Q49. Identify thetwo capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.

 
 
 
 

Q50. You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.

 
 
 
 

Q51. 您的客户已实施 Oracle 云制造,制造用户正在定义工作定义和操作。但是,该用户无法将临时项目 "油脂 "分配给操作。
找出原因。

 
 
 
 

Q52. In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
找出原因。

 
 
 
 

Q53. As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

 
 
 
 

Q54. One of the key execution capabilities that Oracle Manufacturing Cloud offers is thatyou can generate and manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?

 
 
 
 
 

Penetration testers simulate 1Z0-1075-21 exam: https://www.passtestking.com/Oracle/1Z0-1075-21-practice-exam-dumps.html

管理

發佈留言

發佈留言必須填寫的電子郵件地址不會公開。 必填欄位標示為 *

输入下图中的文字
 

发表评论

zh_TWChinese